Connection at public land
or > 250 A in low voltage
We support you gladly and clarify with you the production, modification or dismantling of a connection in the low voltage > 250 A / 173 kVA or a temporary connection on public land.
Connection in low voltage > 250 A / 173 kVA
Construction of new connection > 250 A / 173 kVA
You can get an overview of the process and requirements for setting up a grid connection in low voltage in the leaflet BDEW fact sheet "The grid connection".
Please only apply for a new connection up to 250 A via our customer portal.
Inquiries / applications for a connection up to 250 A to our mailbox will not be considered.
Required documentation:
- Grid connection application form (only for grid connections > 250A)
- Grid connection application forms and data sheets corresponding VDE-AR-N 4100 appendix B
- Detailed list of services (depending on planned construction measures: e.g. number of apartments, type of hot water provision, number of business units, type of business, technical building performance specifications)
- Construction site address and developer address and, if different: the address to which the quotation should be sent
- Scale site plan and/or cellar floor plan showing the desired location of the house connection to be installed.
Please send your request to sonderanschluesse@stromnetz-berlin.de.
Please also note the information on the further process.
Relocation, increasing capacity and removal > 250 A / 173 kVA
You can initiate changes on an existing connection up to 250 A via our customer portal.
Inquiries / applications for a connection up to 250 A to our mailbox will not be considered.
For this work on an existing connection, we require the following documents:
- Grid connection application form (only for grid connections > 250 A)
- Grid connection application forms and data sheets corresponding VDE-AR-N 4100 appendix B
- Construction site address and developer address and, if different: the address to which the quotation should be sent
- Scale site plan and/or cellar floor plan showing the desired future location of the grid connection.
Please also note the information on requesting the connection and the next steps.
In the event of an increase the capacity, we also require:
- a detailed list of services (depending on the construction project: e.g. number of apartments, type of hot water preparation, number of commercial units, type of business, technical building requirements)
Please send your request to sonderanschluesse@stromnetz-berlin.de.
Further process
Please only apply for a new connection or increasing capacity, relocation or dismantling of an existing connection up to 250 A via our customer portal.
Inquiries / applications for a connection up to 250 A to our mailbox will not be considered.
Once you have made this application, you will receive a quotation with further documents. By signing the quotation and, if applicable, the grid connection agreement, you are contractually commissioning the connection.
Low voltage grid connection agreement (sample)
In German language only.
Information sheets, guidelines and forms
BDEW fact sheet "The grid connection"
"Temporary connections with connection or distribution box" guide
Grid connection application form (only for connections > 250 A)
Information for completing the forms
Grid connection application forms and data sheets corresponding VDE-AR-N 4100 appendix B
All documents in German language only.
Temporary connection on public land
Snack bar, kiosk, street party, market or event
Supplying energy to a snack bar, kiosk, street party, market or another type of event requires a temporary connection.
We require the following documents and information to process your request:
- Grid connection application form (only for grid connections > 250A)
- Grid connection application forms and data sheets corresponding VDE-AR-N 4100 appendix B
- Dates of the event
- Sketch/map of the event site
- Specifications of the required output (kW)
- The address of the event location and the address of the applicant (if different: the address to which the quotation should be sent)
- Applicant's telephone number (and additional contact details if required)
To ensure that your request can be processed properly, please contact us well before the intended start of the event.
The cost of the temporary connection is calculated individually for each customer after the event has finished.
Please send your request to strassenland@stromnetz-berlin.de.
Please send your request to strassenland@stromnetz-berlin.de
Electricity supplies for construction sites on public land
Supplying energy to a construction project on public land requires a temporary connection.
You can apply a construction connection up to 250 A for a private property via our customer portal.
Inquiries / applications for a connection up to 250 A for a private property to our mailbox will not be considered.
We require the following documents and information to process your request:
- Grid connection application form (only for grid connections > 250A)
- Grid connection application forms and data sheets corresponding VDE-AR-N 4100 appendix B
- Specifications of the required output
- The address of the construction site and constructor (if different: the address to where you would like us to send the offer)
- If you plan to use cranes: crane type and data
- Construction site map
- Applicant's telephone number (and additional contact details if required)
To ensure that your request can be processed properly, please contact us well before the intended start of the construction project.
Please send your request to strassenland@stromnetz-berlin.de.
Information sheets, guidelines and forms
BDEW fact sheet "The grid connection"
"Temporary connections with connection or distribution box" guide
Grid connection application form (only for grid connections > 250 A)
Information for completing the forms
Grid connection application forms and data sheets corresponding VDE-AR-N 4100 appendix B
All documents in German language only.
Attention!
Please note that you have to clarify the supply of energy for your event or construction project separately with an electricity supplier of your choice.