Connection to the high-voltage grid

Here you will find information on connections to our 110 kV high-voltage grid.

New connection

You require a high connected capacity for your business. Whether you are looking to have your own high-voltage connection to our 110 kV network out of necessity or because it would be useful, we would be happy to work with you.

Making alterations to a connection

You already operate a 110 kV connection and would like to make alterations to your private plant (e.g. an Extension, Supply) or you need to adapt your connected capacity. Please get in touch with us.

Kontakt

  • Michael Franke

    030 -492 02-86 73

    Montag - Freitag
    9 - 14 Uhr

Technical requirements for connection

For planning, set-up, and operation of and changes to customer installations (transformer stations and generation facilities) on the 110 kV high-voltage network in Berlin, the technical requirements for the connection to the high-voltage network (VDE-AR-N 4120*) as well as the supplementary Berlin-specific technical requirements for connection to the high-voltage network in Berlin, apply.

Please use the relevant data specification sheets from the technical requirements when submitting your request.

All downloads are available in German language only.

Those requesting a network connection according to the Ordinance on the Connection of Power Plants to the Network (KraftNAV) shall also use the basis of our requirements for connecting to the high-voltage network in Berlin.

Note:
Since May 2016, the "Commission Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of Generators" has applied. At present, this is being transposed into national law by the relevant bodies, such as the VDE-FNN, and we expect an amendment to the technical connection regulations (TAR).1

1The VDE-AR-N 4120 forms part of the VDE regulations and can be purchased from VDE Verlag GmbH.

Price sheet reactive energy

When withdrawal electrical energy, a displacement factor (cos Phi) between 0.9 inductive and 1 must always be observed. If this is not the case, no reactive work is calculated according to the following price sheets.