Information on your house connection:

New house connection

You can get an overview of the process and requirements for setting up a new house connection in the leaflet "The electrical connection - fact sheet for developers and architects" (PDF 8 MB).

Required documentation:

  • "Grid connection application" (PDF 554 kB) form
  • detailed performance listing (depending on planned construction measures: e.g. number of apartments, type of hot water provision, number of business units, type of business, technical building performance specifications)
  • Construction site address and developer address and, if different: the address to which the quotation should be sent
  • scale site plan and/or cellar floor plan showing the desired location of the house connection to be installed.

 

Please also note the information on requesting the connection and the next steps.

Relocation

To change the location of an existing house connection, we require the following documents:

  • "Grid connection application" (PDF 554 kB) form
  • Construction site address and developer address and, if different: the address to which the quotation should be sent
  • scale site plan and/or cellar floor plan showing the desired future location of the house connection.

 

Please also note the information on requesting the connection and the next steps.

Increasing capacity

To increase the capacity of an existing house connection, we require the following documents:

  • "Grid connection application" (PDF 554 kB) form
  • detailed performance listing (depending on planned construction measures: e.g. number of apartments, type of hot water provision, number of business units, type of business, technical building performance specifications)
  • Construction site address and developer address and, if different: the address to which the quotation should be sent
  • scale site plan and/or cellar floor plan showing the location of the house connection.
Please also note the information on requesting the connection and the next steps.

 

Removal

To remove an existing house connection, we require the following documents:

  • "Grid connection application" form (PDF 554 kB)
  • Construction site address and developer address and, if different: the address to which the quotation should be sent
  • scale site plan and/or cellar floor plan showing the location of the house connection to be removed.

 

Please also note the information on requesting the connection and the next steps.

 

Costs

The current costs of installing/changing a house connection are listed on our price sheet.

 

You can calculate the provisional cost of connecting a detached house yourself, using our house connection calculator. Calculate the probable cost of connecting your detached house in three steps. You can compare different types of connection and request a quotation.

 

Contract documents

Persons authorised to carry out electrical installation work

When choosing your electrician, please ensure that they are registered in an installer directory.

Please use our electrician search function to select a specialist electrical company registered with Stromnetz Berlin.

to electrician search function

The next steps in the process

Please send us - via your installer if applicable - your completed documentation: kundenanschluesse@stromnetz-berlin.de.

Once you have made this application, you will receive a quotation with further documents. By signing the quotation and, if applicable, the grid connection agreement, you are contractually commissioning the connection.