Partners and collaboration

In Germany, the energy revolution refers to fundamental changes to the structure of electricity generation. There are fewer and fewer large power plants and a continual increase in electricity generated from renewable sources, which provide electricity dependent on the weather and time of day. In the short term, this gives rise to additional requirements, e.g. due to the expansion of electromobility. Our energy system is changing quickly and we believe that we can best conquer these challenges together. This is why we are actively collaborating with partners from the energy sector and helping to shape the energy revolution for our customers.

DSO 2.0 – Tomorrow's distribution system operator

Distribution grids play a particular role in the integration of renewable energies and will meet several new customer requirements in the future. Against a background of these developments, distribution system operators' responsibilities continue to increase. The energy revolution requires intensive cooperation between transmission system operators, which ensure electricity is transported over long distances, and distribution system operators, which guarantee the reliable supply of electricity locally. Furthermore, new information sharing requirements must be managed together, through digitalisation and with smart grid solutions. We are actively supporting the development of solutions for tomorrow's distribution grid.

Further information

How distribution system operator facilitate the next step of energy revolution (Video - only in German)

ARGE Ost

The ARGE Ost was established by eastern Germany's system operators in 2012. At present, the partnership includes Avacon Netz GmbH, E.DIS Netz GmbH, ENSO NETZ GmbH, Mitteldeutsche Netzgesellschaft Strom GmbH, Stromnetz Berlin GmbH, Stromnetz Hamburg GmbH, Netze Magdeburg GmbH, TEN Thüringer Energienetze GmbH & Co. KG and WEMAG Netz GmbH. Along with the transmission system operator 50Hertz Transmission GmbH, the participating system operators aim to facilitate the energy revolution, based on efficient grid expansion, and to work together to develop solutions for a secure energy supply going forward. We are supporting this through joint pilot projects.

As early as 2014, we agreed on a joint 10-point programme. There is now a report by ARGE OST containing specific suggested solutions to develop grid management in line with the new requirements, share information efficiently, make best use of the opportunities presented by digitalisation and work together to improve the outlook.

We ensure that our network continues to be crisis-proof and even more flexible. In this way, we make a significant contribution to the energy transition, promote electromobility and the integration of environmentally friendly decentralized energies, thus supporting Berlin on the road to climate neutrality.

All downloads are available in German language only.