Replacement construction of the Westend substation


We are investing in the future of your neighbourhood — and thus in maintaining and expanding a secure electricity grid.

More and more charging stations for electric vehicles and photovoltaic systems on roofs and balconies are shaping Berlin's cityscape. At the same time, the electricity grid is also expected to contribute to heat supply in the future. To meet these diverse requirements, we are renovating and expanding the Westend substation – with modern and more powerful systems for a stable and future-proof energy supply.

Replacement construction of the substation

A substation at Charlottenburg centre has been in operation since 1976. Since then, technology has advanced and technical requirements have increased. The switchgear therefore urgently needs to be replaced. However, due to limited space in the existing building and on the site, it is not feasible to construct a replacement building on the same site.

New location for the substation

The site of a former substation in the Westend neighbourhood was selected as the new location. In order to build a more modern facility there, the existing building must first be demolished. Subsequently, a sustainable new building will be constructed on the site to meet the increasing demands on the power supply.

Information on planned construction work

  • Demolition is scheduled for 2026.
  • Construction of the building is expected to begin in 2027.
  • Completion is planned for 2031.

Restrictions during construction work

Construction work is rarely silent, nor does it take place without restrictions. You should expect the following disruptions during the construction period:

  • Temporary restrictions or closures on public roads.
  • Work will take place on weekdays between 6 am and 8 pm (depending on the season) and will lead to increased noise levels during certain phases.
  • Construction noise will not occur throughout the entire construction period, but only during individual phases that are necessary for the construction work.
  • Access to private properties will remain unaffected, but if access routes are affected, individual arrangements will be made on site with the responsible construction company.
  • No planned power cuts are expected.
  • Emergency routes and waste disposal will remain unaffected. Please note any notices posted by the BSR.

Construction period

2026 to 2031

Contact

Yvonne Post
Consultant Citizen Dialogue

T 030 49202 0294
(Customer contact, Mo - Fr, 8 am - 6 pm)

[email protected]

Brochure on the replacement construction of the Westend substation

In German language only.