Connection in low voltage
We support you gladly and clarify with you the production, modification or dismantling of a connection in the low voltage (400 V).
You require for the power supply of a construction project, street party, street market or another event a temporary connection.
Information on construction of a connection for electromobility charging infrastructur you will find here.
Process in seven steps for connections via our customer portal
-
Register
-
Log-in
Users must log in to the customer portal to create or edit processes.
-
Edit / review
Processes are processed by customers, electrical installers and us in the customer portal.
-
Approval
The customer confirms and approves the request for a connection and the responsibility of the electrical installer.
-
Proposal
After all submitted documents and information have been checked, the customer will receive an offer for the requested service.
-
Commissioning
After checking the offer, the customer accepts the offer and commissions the service.
-
Implementation
After the commissioning, the implementation takes place at an agreed date.
Construction of new connection
You can get an overview of the process and requirements for setting up a grid connection in low voltage in the leaflet BDEW fact sheet "The grid connection".
You can apply for a new grid connection via our customer portal.
Required documentation:
- Detailed list of services (depending on planned construction measures: e.g. number of apartments, type of hot water provision, number of business units, type of business, technical building performance specifications)
- Construction site address and developer address and, if different: the address to which the quotation should be sent
- Scale site plan and/or cellar floor plan showing the desired location of the house connection to be installed.
Please also note the information on the further process.
Relocation, increasing capacity and removal
You can initiate changes on an existing connection via our customer portal.
For this work on an existing connection, we require the following documents:
- Construction site address and developer address and, if different: the address to which the quotation should be sent
- Scale site plan and/or cellar floor plan showing the desired future location of the grid connection.
Please also note the information on requesting the connection and the next steps.
In the event of an increase the capacity, we also require:
- a detailed list of services (depending on the construction project: e.g. number of apartments, type of hot water preparation, number of commercial units, type of business, technical building requirements)
Costs / price sheet
The current costs of installing/changing a connection are listed on our price sheet.
Price sheet for low voltage grid connections
Price sheet for low voltage grid connections from 01.01.2023
Further process
You can only initiate a new connection or changes to an existing connection via our customer portal.
Once you have made this application, you will receive a quotation with further documents. By signing the quotation and, if applicable, the grid connection agreement, you are contractually commissioning the connection.
Low voltage grid connection agreement (sample)
In German language only.
Information sheets, guidelines and forms
BDEW fact sheet "The grid connection"
"Temporary connections with connection or distribution box" guide
All documents in German language only.
Persons authorised to carry out electrical installation work
When choosing your electrician, please ensure that they are registered in an installer directory.
Please use our electrician search function to select a specialist electrical company registered with Stromnetz Berlin.
Temporary connection
You require for the power supply of construction project, street party, market or another event a temporary connection. Information on this activities you will find in the leaflet „Temporary connections with connection and distribution boxes" (Zeitlich befristete Anschlüsse mit Anschluss- bzw. Anschlussverteilerschränken).
Snack bar, kiosk, street party, market or event
Supplying energy to a snack bar, kiosk, street party, market or another type of event requires a temporary connection.
You can apply a temporary connection via our customer portal in the section of public road land ("Öffentliches Straßenland").
We require the following documents and information to process your request:
- Dates of the event
- Sketch/map of the event site
- Specifications of the required output (kW)
- The address of the event location and the address of the applicant (if different: the address to which the quotation should be sent)
- Applicant's telephone number (and additional contact details if required)
To ensure that your request can be processed properly, please contact us well before the intended start of the event.
The cost of the temporary connection is calculated individually for each customer after the event has finished.
Electricity supplies for construction sites
Supplying energy to a construction project requires a temporary connection.
You can apply a construction connection via our customer portal in the section connection ("Anschluss").
We require the following documents and information to process your request:
- Specifications of the required output
- The address of the construction site and constructor (if different: the address to where you would like us to send the offer)
- If you plan to use cranes: crane type and data
- Construction site map
- Applicant's telephone number (and additional contact details if required)
To ensure that your request can be processed properly, please contact us well before the intended start of the construction project.
Information on connection applications
We recommend that you seek the advice of an installer from the list of installers when applying for your house connection or when planning to change your existing connection. This avoids delays in the construction process and ensures that the project can be executed from a technical point of view in accordance with the technical low voltage grid connection requirements (TAB NS Nord).
Information sheets, guidelines and forms
- BDEW fact sheet "The grid connection"
- "Temporary connections with connection or distribution box" guide
- Grid connection application form (only for temporary grid connections)
- Grid connection application forms and data sheets corresponding VDE-AR-N 4100 appendix B
- Grid connection guidelines
All documents in German language only.
Are you looking for an electrician?
A registered electrician will be happy to assist you with any questions you may have regarding your connection.
Contact person
Please contact us, if you have further questions around a grid connection in low voltage. We answer gladly your questions and support you.